Project structure
Work package 3 (WP3): Developing a multi-stakeholder tool
Work package 3 integrates the results from work package 1 and 2. The result of work package 3 will be a new multi-stakeholder tool. The focus in this work package is on developed specific methods and instruments. This includes interview protocols, methods for mapping stakeholder expectations, workshop designs and the design of action plans.